Blackwall Tunne:Final weekend closure this year
MOTORISTS are warned the Blackwall Tunnel will be closed to southbound traffic this weekend as part of the refurbishment of the 113 –year-old river crossing.
During the closure, the Rotherhithe Tunnel will operate two lanes in the southbound direction only, while the Blackwall Tunnel will carry only northbound traffic.
The same arrangement during the last closure in July resulted in considerably less congestion overall throughout East London.
Other and alternative river crossings are Tower Bridge, the Woolwich Ferry or the Dartford Crossing.
The Ferry will run additional services between 6.10am – 10pm on Saturday and 9am – 9.30pm on Sunday.
It will be the last weekend closure of the year, though more but fewer are planned until early 2012.
Work completed so far includes the installation of new ventilation fans in two of the tunnel’s four shafts and the installation of temporary lighting, CCTV and communications systems throughout the tunnel. Work to install the permanent systems, which will bring the tunnel up to current standards, has also recently begun.
For more information, visit www.tfl.gov.uk/blackwalltunnelrefurbishment.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here